Activation System Inspection
100022-00
Use the following tasks to assemble and install the extraction rocket system.
Applicable Aircraft Serial Numbers
All
Type of Maintenance
Line
Level of Certification
LSA-RM
Task Specific Training Required
No
Special Tools Required
None
Parts Required
None
Aircraft System and Number
16—ICON Parachute System (IPS)
Safety Equipment
As Needed
Consumables
None
Task Instructions
1. Inspect activation cable line from the activation handle to the rocket for evidence of cracking, kinking, or chaffing.
Warning:
At no time pull or force the cable-rocket could be activated.
Compare the section of the activation line that is routed through the engine bay against a section that is in a relatively cooler area (for example fwd. of the bulkhead near the activation handle). Compare color, brightness, and texture. Replace activation line if there is any variation between these two sections.
3. Check security of the activation handle mounting plate.
4. Visually inspect the activation handle for damage or abnormalities.
Verification Method
Verify there is no chafing, discoloration, damage, or other anomalies.