ICON A5 MM : Landing Gear : Main Landing Gear : Maintenance Instructions : Main Landing Gear (MLG) Actuator Removal
Main Landing Gear (MLG) Actuator Removal
100025-01
Use the following task to remove the main landing gear (MLG) actuator.
Applicable Aircraft Serial Numbers
All
Type of Maintenance
Line
Level of Certification
LSA-RM
Task Specific Training Required
No
Special Tools Required
ICA009749 (WING HARD JACKING POINT)
Parts Required
None
Aircraft System and Number
11—Landing Gear
Safety Equipment
As Needed
Consumables
None
Task Instructions
1. Jack the aircraft until the landing gear is safely off the ground.
2. Remove the aft bulkhead baggage panel. (Removal and Installation of Inspection Panels and Fairings)
3. Disconnect the MLG actuator connector at the aircraft harness.
4. Remove retaining ring and wrist pin from right hand MLG push rod connected to the trunnion. Retain for Main Landing Gear (MLG) Actuator Installation.
5. Use 1/2 and 3/8 wrenches to remove the AN5 bolt, nut, and washer that attach the MLG actuator to the MLG bellcrank.
6. Use 1/2 and 3/8 wrenches to remove the AN5 bolt, nut, and washer that attach the MLG actuator to the right MLG trunnion.
7. Remove the actuator from the aircraft being careful to not lose the actuator attach bushings. There is a bushing in the motor-end of the actuator and another in the bellcrank.
Verification Method
The task is complete when the actuator has been removed.