Connect High Pressure AOA Line
100102-01
Use the following to connect the High Pressure AOA line with the aircraft.
Applicable Aircraft Serial Numbers
00139+
Type of Maintenance
Line
Level of Certification
LSA-RM
Task Specific Training Required
No
Special Tools Required
None
Parts Required
ME000612 (HIGH PRESSURE AOA LABEL)
Aircraft System and Number
10—Instruments (and Avionics)
Safety Equipment
As Needed
Consumables
None
Task Instructions
1. Identify the high pressure AOA line (routed inside fuselage on LH side of aircraft). Route to MSC.
Note: 
Do not route AOA Line through fuselage wire harness tie mounts. Route the AOA line through the PITOT and STATIC cable ties.
2. Apply “HIGH PRESSURE AOA” label in the noted location. Trim excess hose as required and connect hose to the port on MSC labeled “Ahigh”. Ensure hose is fully inserted into connector.
Figure 264. High Pressure AOA Line
Verification Method
Verify there are no instances of wire chafing and that wire protection is applied in the appropriate locations.
Verify all connectors have good connections and adequate strain relief.
Verify zip ties are tightened properly, adequately holding wire harness in place and preventing movement without visible signs of bending or cutting wire insulation/sleeving or pinching pitot/static lines.
Perform PITOT Static leak check. Pitot-Static-AOA Leak Test Procedures