Install Oil Cooler and Thermostat (00021+)
100360-01
Use the following procedure to install the Oil Cooler and Thermostat.
Applicable Aircraft Serial Numbers
00021+
Type of Maintenance
Line
Level of Certification
LSA-RM
Task Specific Training Required
No
Special Tools Required
None
Parts Required
ICA011703 (OIL COOLER)
AN815-8D (FITTING, UNION, .500 TBG, AL)
9752K118 (O-RING, VITION, .644 ID x .087 W #908)
P6-H-190 (THERMOSTAT, OIL, THERMOSTATIS)
AN816-8D (FITTING, STRAIGHT, .500 TUBE TO .750-16 PIPE)
Aircraft System and Number
13—Propulsion
Safety Equipment
As Needed
Consumables
OLUBE 844-2 (LUBRICANT, ORING, PARKER O’LUBE)
LOCITITE®243™ (THREADLOCKER, PRIMERLESS, OIL TOL, REMOVABLE MED STR, BLUE)
TT-I-735A or equivalent (ISOPROPLY ALCOHOL)
Task Instructions
1. Apply LUBRICANT to two O-RINGs and install them on the two UNION FITTINGs.
2. Use a 1-inch wrench to install UNION FITTINGs into OIL COOLER. Torque to 468-514 in-lbs.
3. If THERMOSTAT does not have 4X STRAIGHT FITTINGs installed, then clean fittings thread with ISOPROPYL.
4. Apply THREADLOCKER to STRAIGHT FITTING threads. Use a 13/16 wrench to install STRAIGHT FITTING. Torque to 1.5-2.5 turns past finger tight.
5. Install THERMOSTAT onto OIL COOLER as shown in .
Note:
It is easier to torque fasteners after oil lines are installed.
6. Install the two aluminum oil lines between OIL COOLER and THERMOSTAT. Use a 1-inch wrench to hold UNION FITTING on the OIL COOLER, a 13/16 wrench to hold STRAIGHT FITTING on THERMOSTAT, and a 7/8 wrench to turn the AN-8 B-nuts. Torque the B-nuts to 200±50 in-lbs.
7. Use 3/8 and 1/4 wrenches to torque the two Thermostat mounting fasteners to 20 in-lbs.
8. Install the P-clamp as shown in Figure 412. Torque hardware to 20 in-lbs. 9. Ensure the Bulb Seal on the Air Plenum Box is in good condition. Use a 1/4 wrench to install the Oil Cooler assembly to the Air Plenum Box with four #10-32 nuts and washers as shown in Figure 411. Torque to 20 in-lbs. 10. Use a 13/16 wrench to hold the Adapter Fitting and a 7/8 wrench to turn the AN-8 B-nut to install the Thermostat-Engine Hose. Torque B-nut to 200±50 in-lb. (Figure 411) 11. Use a 13/16 wrench to hold the Adapter Fitting and a 7/8 wrench to turn the AN-8 B-nut to install the Tank-Thermostat Hose. Torque B-nut to 200±50 in-lbs.
12. Purge the Engine Oil system per the latest Rotax Installation Manual for Rotax Engine Type 912 i Series.
13. Run the Engine. Check for leaks and the oil pressure. Replenish the oil level as required.