ICON A5 MM : Landing Gear : Nose Landing Gear : Inspection Instructions : Nose Landing Gear (NLG) Actuator Rigging and Actuator Stop Switches Inspection
Nose Landing Gear (NLG) Actuator Rigging and Actuator Stop Switches Inspection
100703-00
The following procedure should be used to inspect the Nose Landing Gear (NLG) actuator rigging and actuator stop switches.
Applicable Aircraft Serial Numbers
00001-00011 and 00013-00020
Type of Maintenance
Line
Level of Certification
LSA-RM
Task Specific Training Required
No
Special Tools Required
ITL001714 REV B (NOSE LANDING GEAR RIGGING TOOL)
Electrical Multimeter with resistance function
Parts Required
ICA013161 (NOSE LANDING GEAR ACTUATOR)
Aircraft System and Number
11—Landing Gear
Safety Equipment
As Needed
Consumables
TY24MX (CABLE TIE, NYLON 6-6, 30LB, 5.50)
Task Instructions
1. Remove the main landing gear, 15A, fuse from the overhead console. Safe this fuse. It will be reinserted after the test is complete.
2. Remove right hand instrument panel. (Right Instrument Panel Top Panel Removal)
3. Fold the wings of the aircraft. This will move the center of gravity aft so that it is easier to lift the nose up and down during the NLG rigging checks.
4. Connect battery charger to the charging terminals. (Charge Battery)
5. Have a foam block or equivalent nearby that can be placed under the aircraft on the keel aft of the NLG wheel well that will allow the nose wheel of the aircraft to have approximately 1 in or more clearance from the ground. This block will need to be removed numerous times during the procedure to place weight on the NLG.
Check the resistance of the NLG stop switches
6. Ensure the landing gear switch is down.
7. Turn on master power and ensure that the landing gear position indicator indicates that the landing gear is down.
8. Turn master power off.
9. Disconnect the NLG actuator 8 pin connector. ()
Figure 333. NLG Electrical Connector
10. Confirm the NLG actuator side of the connector pins are labeled.
11. Using a multimeter set to resistance, measure resistance between the following pins and record the value. (Figure 334)
Note: 
It is important that the meter not be set to just an audible continuity setting—a resistance reading in Ohm, Kilo Ohm, or Mega Ohm range is required.
Table 13. Resistance Measurements of the NLG Stop Switches
Between Pins
Value if NLG is Down
Measured Value
2 & 7
Overload / Open
3 & 4
<1 Ohm
2 & 4
Overload / Open
5 & 6
Overload / Open
6 & 7
<1 Ohm
5 & 7
Overload / Open
Figure 334. Pins
Note: 
The resistance value should be either Overload / Open or less than 1 Ohm. If the value is above 1 Ohm during the resistance checks then stop. The stop switch is bad and the actuator needs to be removed from service.
12. After completing the stop switch resistance checks, reconnect the NLG actuator connector and resecure the connector to the ty-block using a TY24MX ty-rap. The landing gear should be swung to confirm satisfactory actuation after reconnecting this connector.
Nose Landing Gear Rigging Check
13. With normal resting aircraft weight on NLG check:
a. Hold ITL001714 in position, referencing tool off of drag link wrist pin head and bellcrank body. Verify drag link is fully in the “in tolerance” window. If in tolerance, move to Step 14.
b. If not, the nose landing gear needs to be re-rigged to the “nominal range” using ITL001714 Rev B. (Nose Landing Gear (NLG) Rigging and Check with Landing Gear Down (00001-00020))
14. Lift the aircraft nose enough to slide a block or equivalent under the keel to allow the nose wheel to be approximately 1” or greater off the ground.
15. Ensure the 15 am main landing gear fuse is removed
16. Turn the Master switch on.
17. Move thee landing gear handle to the up position to allow the NLG to move to the full up position and stop.
Note: 
The landing gear position indication will still show in transit during this test since the main landing gear is still down. This is normal for this inspection.
18. Move the landing gear handle down, allow the NLG to come full down and stop.
19. Lift the aircraft nose enough to remove the block from under the keel and allow weight back on to the nose wheel. Push down on the nose to preload the landing gear, then release.
Note: 
It’s important to preload the nose briefly by pushing down with approximately 25 lb of weight (push down with hands) enough to visibly flex the nose landing gear leg.
20. Check the NLG rigging using the ITL001714 Rev B tool.
a. If drag link falls within the “in tolerance” range, repeat Steps 13-20 an additional 24 times for a total of 25 times.
b. If not, and nose landing gear has not been re-rigged in step 13, right the NLG actuator o the “nominal range” using ITL001714 Rev B. (Nose Landing Gear (NLG) Actuator Rigging and Actuator Stop Switches Inspection) Repeat Steps 14-20 24 additional times.
c. If at any time the NLG has been re-rigged once during this process and the drag link falls outside of “in tolerance” range during the 25 NLG cycles, the actuator stop switch is not functioning correctly and needs to be replaced.
Figure 335. ITL001714 Rev B indexed on NLG bellcrank showing the drag link within the “in tolerance” range
Figure 336. Summarized Flow Chart of the NLG Rigging Test Procedure Using ITL001714 Rev B
Verification Method
See Step 20.